WRLD

Search

#AVESeguro
Pablo Haro Urquízar 14h

Pablo Haro Urquízar wrote that the ERTMS security system for the Madrid-Sevilla line, approved in 2020 and awarded in 2021 for 93.8 million, was supposed to be ready since January 2026. He also stated that, after the old LZB failed, the control center authorized the AVE to circulate and it collided with a stopped Iryo, resulting in at least 68 deaths. https://t.co/HYXgKCdO4b #AVESeguro #SeguridadVial #Trenes (translated)

2124