The completion of the Brenner tunnel, a mega railway infrastructure crucial for the connection between Italy and Germany, has been postponed to 2043, with an expected cost increase of an additional 1.2 billion, bringing the total to 11.7 billion. #TunnelDelBrennero #Infrastrutture #CostiEurpa (translated)
