We launched into operation a 2.2-kilometer section between Petersburg and Lubenec, with the expectation that by the end of November we will remove the temporary connection that has been used until now," said Radek Mátl, the general director of the Directorate of Roads and Highways (ŘSD). #DálniceD6 #KarlovyVary #StavbaSilnic (translated)
