WRLD

Search

#LinhaCircular
Observador Just Now

The Rossio, Baixa-Chiado, and Cais do Sodré stations of the Green line of the Lisbon Metro will have reduced hours between November 27 and December 1 due to preparation work for the future Circular line, which is expected to operate by the end of the first quarter of 2027. #MetroDeLisboa #TransportesPúblicos #LinhaCircular (translated)

observador.pt
Linha Verde condicionada devido trabalhos da linha Circular
880
S
Sofia Lisboa 2d

In the PCP, Sofia Lisboa reinforced the stance that the Circular Line is "a wrong option," which does not address the mobility needs of the city and the Metropolitan Area of Lisbon and that, on the contrary, will "hurt thousands of users" who daily travel from the peripheral areas to the center of the capital. #MetroDeLisboa #MobilidadeUrbana #LinhaCircular (translated)

AML pede Linha em Laço em vez de Linha Circular
observador.pt
2765