BETA nonprofit public democratic european moderated

WiktorF #TakDlaCPK

1 posts

WiktorF #TakDlaCPK

Mentions and quotes

It is rated as valuable, well-written, and contributing new insights to science - why are there so many mistakes in it? To avoid boring you, I will point out three. 1. How can you confuse the Yamal gas pipeline with the Urengoy - Uzhhorod pipeline? The Yamal gas pipeline - in 1993, an agreement was signed between Poland and Russia, construction took place from 1994 to 1999, gas transmission started in 1999, and in 2005 full capacity was achieved. The Urengoy - Uzhhorod pipeline - construction took place from 1982 to 1984. 2. How can you confuse consumption with production? Annual demand is 4-5 billion m³, while gas consumption was 9-10 billion m³ during the period 1990-1995 (I refer you to Przemysław Kątny, "Trends in Primary Fuel Consumption in Poland from 1989 to 2000," 2003). 3. You conducted interviews, but without recording or notes, relying on your memory. This is a lack of any verification. Why hide behind confidentiality of information? This is not what research looks like. THERE IS NO EMPIRICAL SOURCE! THIS IS NOT HOW A DOCTORATE LOOKS! Drama, drama, drama. (translated)