Due to the water level of the Danube, the nuclear power plant in Paks is operating at just under 1/4 capacity. Next week, it will completely shut down. Besides the water level, the temperature has been a problem for years. This was already reported in 2016 by MEP Jávor Benedek, but the calculations of Paks2 did not take this into account. (translated)

