The French research vessel "Abeille Marengo" is on standby at the port of Heraklion, waiting to begin the installation of the electrical interconnection cable between Greece and Cyprus, with a possible departure within 24 to 48 hours. #ΗλεκτρικήΔιασύνδεση #Ελλάδα #Κύπρος (translated)


